Took me about 3 and a half hours to do this. Looks good, now I need to get off the couch and begin segmenting the network for when my SO clicks on a green download button.

  • redlemace@lemmy.world
    link
    fedilink
    arrow-up
    5
    ·
    19 days ago

    The guy i worked with that always ran the cables told me to never run 1. Run 2 or 3 while you’re at it. That’s not the cost, the work is. Solid advise. Following it for deccades now, never a regret. In over 75% of the time he’s right. There is always a use for the extra in the weeks after laying them.