Rip apart the data centres infrastructure and turn them into massive-scale sodium battery storage systems and cover the facility in solar and wind turbines as a gen-bat system
It’s not about the energy, it’s about actually having the gear installed for people to plug into. DC fast chargers are something like $50k to $100k each, and they need big fat grid connections or buffer batteries. Especially if there’s a few of them next to each other.
Rip apart the data centres infrastructure and turn them into massive-scale sodium battery storage systems and cover the facility in solar and wind turbines as a gen-bat system
It’s not about the energy, it’s about actually having the gear installed for people to plug into. DC fast chargers are something like $50k to $100k each, and they need big fat grid connections or buffer batteries. Especially if there’s a few of them next to each other.
Do that same with parliament house
Add Reggie’s to the list. That guy is a dick.